21st August 2020

"Midland Metropolitan Hospital: A work in progress" Novum

"Novum called upon our global team of experts throughout this project. The majority of the steel was fabricated by Novum in its ISO 9001 certified steel fabrication facility in Turkey with only the lift core structural steelwork procured in the UK for ease of transport. The collaboration between Novum Structures Turkey and Novum Structures China was instrumental in the procurement of glass fittings, and Novum Membranes produced 6000 m2 of ETFE pillows."Read the article here.

Share